Awards

Huntsville Hospital


The scope was the addition of a new generator and parallel gear into an existing system. All the work had to be accomplished within the confines of a fully operational hospital, requiring Jesse Stutts, Inc. to be able provide life safety and critical systems backup emergency power systems at any time, under any circumstance.

Huntsville Hospital
  • Use: An 8 Megawatt substation with four 2 Megawatt Cummins Generators that have the capabilities to supply emergency power if needed, this substation supplies the main electrical power to the Army Military Command center.
  • Contract Amount: $2,395,650
  • Duration: 9 Months
  • Sepcial Features:

      SRX-MST Emergency Power Upgrades